Operation of ELE Permeameter CX(s) Applied: B3.6Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 9, 2015Operation of ELE Permeameter
CX(s) Applied: B3.6
Date: 06/09/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The purpose of this task will be to test the permeability of various simulated samples using an existing permeameter located in laboratory 107 of 999-1W. Testing will be conducted on non-radioactive samples.