Install Blank on Line WEE-3222 after 242016F Overheads CX(s) Applied: B1.3Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
June 30, 2015Install Blank on Line WEE-3222 after 242016F Overheads
CX(s) Applied: B1.3
Date: 06/30/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
FTF-TMC-09-005 requires removal because it does not meet code. It removes excess rain water from 242016F Overheads and sends it to F-Area Lift Station Down comer L4. After Temp Mod removal, the piping can not be restored back to it original condition because the underground process sewer piping failed. A design change is required to install blind flanges and status the line as Out of Commission (OOC).