Wautoma-Ostrander No. 1 Upgrade Project CX(s) Applied: B1.3, B4.6Date: 09/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 2, 2015Wautoma-Ostrander No. 1 Upgrade Project
CX(s) Applied: B1.3, B4.6
Date: 09/02/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to address a surface impairment that was identified on the Wautoma-Ostrander No. 1 transmission line, where the conductors do not have adequate clearance from the ground surface for operation at 100°C.