Warm Waste Effluent Radiation Monitor and Transfer Pump M-54 Recirculation Evaluation and Modification CX(s) Applied: B3.1Date: 12/07/2015 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
December 7, 2015Warm Waste Effluent Radiation Monitor and Transfer Pump M-54 Recirculation Evaluation and Modification
CX(s) Applied: B3.1
Date: 12/07/2015
Location(s): Idaho
Offices(s): Nuclear Energy
The primary goal of the DBFT program is to drill a 5,000-meter-deep characterization borehole with a 3,000-meter open-hole section across crystalline bedrock, and to conduct scientific testing to characterize the hydrogeologic, geochemical, and geomechanical properties of the near-borehole host rock.
CX(s) Applied: B3.1
Date: 12/07/2015
Location(s): Idaho
Offices(s): Nuclear Energy
The primary goal of the DBFT program is to drill a 5,000-meter-deep characterization borehole with a 3,000-meter open-hole section across crystalline bedrock, and to conduct scientific testing to characterize the hydrogeologic, geochemical, and geomechanical properties of the near-borehole host rock.