Test Reactor Area (TRA)-653 Machine Shop Reconfiguration and Equipment Installation Project CX(s) Applied: B1.31Date: 11/20/2015 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
November 20, 2015Test Reactor Area (TRA)-653 Machine Shop Reconfiguration and Equipment Installation Project
CX(s) Applied: B1.31
Date: 11/20/2015
Location(s): Idaho
Offices(s): Nuclear Energy
Two drinking fountains at the Advanced Test Reactor Complex building TRA-1608 developed a water leak and had to be removed. The proposed action would replace the water fountains with two ELKAY model LZSTL8WSSP water fountains.
CX(s) Applied: B1.31
Date: 11/20/2015
Location(s): Idaho
Offices(s): Nuclear Energy
Two drinking fountains at the Advanced Test Reactor Complex building TRA-1608 developed a water leak and had to be removed. The proposed action would replace the water fountains with two ELKAY model LZSTL8WSSP water fountains.