Wastewater Study for Overall Feasibility Study of IGCC to CTL Plant CX(s) Applied: A9, A11Date: 12/09/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
December 9, 2015Wastewater Study for Overall Feasibility Study of IGCC to CTL Plant
CX(s) Applied: A9, A11
Date: 12/09/2015
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Develop a feasibility study focused on retrofitting the Wabash River Unit 1 - IGCC to a coal to jet fuel plant. Work in Canonsburg by Aquatech will focus on wastewater treatment.
CX(s) Applied: A9, A11
Date: 12/09/2015
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory
Develop a feasibility study focused on retrofitting the Wabash River Unit 1 - IGCC to a coal to jet fuel plant. Work in Canonsburg by Aquatech will focus on wastewater treatment.