Development of Best Practices and Risk Mitigation Measures for Deepwater Cementing in Oil-Based Mud and Synthetic-Based Mud CX(s) Applied: B3.1, B3.16Date: 12/04/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
December 4, 2015Development of Best Practices and Risk Mitigation Measures for Deepwater Cementing in Oil-Based Mud and Synthetic-Based Mud
CX(s) Applied: B3.1, B3.16
Date: 12/04/2015
Location(s): Texas
Offices(s): National Energy Technology Laboratory
Samples of drilling fluid, spacer, and cement will be collected from offshore drill site and sent back to lab for analysis.
CX(s) Applied: B3.1, B3.16
Date: 12/04/2015
Location(s): Texas
Offices(s): National Energy Technology Laboratory
Samples of drilling fluid, spacer, and cement will be collected from offshore drill site and sent back to lab for analysis.