Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - GFE (BM-MM-1203A) CX(s) Applied: B1.3Date: 12/15/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
December 15, 2015Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - GFE (BM-MM-1203A)
CX(s) Applied: B1.3
Date: 12/15/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Vendor shall furnish all labor, tools, materials, equipment, supplies, transportation, Supervision, and services required to provide four oil water separators as government furnished equipment (GFE) for installation at Bryan Mound Caverns 1, 2, 4, and 5 by others under project BM-MM-1203.
CX(s) Applied: B1.3
Date: 12/15/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Vendor shall furnish all labor, tools, materials, equipment, supplies, transportation, Supervision, and services required to provide four oil water separators as government furnished equipment (GFE) for installation at Bryan Mound Caverns 1, 2, 4, and 5 by others under project BM-MM-1203.