CX-014473: Categorical Exclusion Determination

Replace Steam Line Pole L-2 CX(s) Applied: B1.3Date: 11/23/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

November 23, 2015
Estimated Read Time   min

Replace Steam Line Pole L-2
CX(s) Applied: B1.3
Date: 11/23/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office

Replace rotten steamline pole L-2 located north of Building 183-L.

Document(s) Available for Download