Relocate Ballistic Resistance Enclosure
Office of NEPA Policy and Compliance
September 21, 2015Relocate Ballistic Resistance Enclosure #1 Heating, Ventilation and Air Conditioning
CX(s) Applied: B2.1
Date: 09/21/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The current roof-mounted HVAC unit for Ballistic Resistance Enclosure (BRE) #1 requires assembly of scaffolding to access for maintenance. This reduces HVAC unit accessibility that limits routine maintenance allowed. Proposed activity will relocate the HVAC unit.