CX-014541: Categorical Exclusion Determination

Coolidge Substation Communication Equipment Upgrades CX(s) Applied: B4.6Date: 10/20/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

Office of NEPA Policy and Compliance

October 20, 2015
Estimated Read Time   min

Coolidge Substation Communication Equipment Upgrades
CX(s) Applied: B4.6
Date: 10/20/2015
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region

Western Area Power Administration is proposing to upgrade protection and communication equipment located in Coolidge Substation's control building to protect our system from planned electrical flow changes on Salt River Project's transmission line that terminates at the substation.

Document(s) Available for Download