Longview Osmose 2015 Corrosion Mitigation and Repair Project CX(s) Applied: B1.3Date: 07/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
July 2, 2015Longview Osmose 2015 Corrosion Mitigation and Repair Project
CX(s) Applied: B1.3
Date: 07/02/2015
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to repair deteriorating steel support structures where corrosion may be affecting the footings and structural integrity of the towers.