Temporary Back-Up Generator Installation CX(s) Applied: B1.3, B1.15, B1.31, B2.2Date: 02/22/2015 Location(s): TexasOffices(s): Pantex Site Office
Office of NEPA Policy and Compliance
February 22, 2015Temporary Back-Up Generator Installation
CX(s) Applied: B1.3, B1.15, B1.31, B2.2
Date: 02/22/2015
Location(s): Texas
Offices(s): Pantex Site Office
This project is a Design-Build project for design, installation and start-up of a temporary, stand-alone, stand-by diesel generator unit (approximately 10' wide and 60' long) to provide temporary back-up power to the G-Loop as assurance that the Plant has adequate protection until planning, design and construction of permanent replacement generators.