December 29, 2015Project L-840: Export Water Line Replacement, 2901Y to 200W
CX(s) Applied: B5.5
Date: 12/29/2015
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
Engineer, Design and Construct a new Export Water Line, approximately 2.47 miles long, from the 2901Y Valve House to the 282-W Inlet House and Reservoir.