API 653 Inspection of BMT-2 Prior to Conversion CX(s) Applied: B1.3Date: 03/01/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
March 1, 2016API 653 Inspection of BMT-2 Prior to Conversion
CX(s) Applied: B1.3
Date: 03/01/2016
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all transportation, materials, equipment, supplies, tools, facilities, utilities, labor, and supervision required to perform an API 653 inspection of the Bryan Mound Crude Oil Tank, BMT-2. Tasks include inspection of tank foundation, tank bottom and tank shell, and performing ultrasonic and magnetic particle testing.