West Hackberry Rework 42-inch Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3Date: 01/29/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
January 29, 2016West Hackberry Rework 42-inch Crude Oil Pipeline Mainline Valves
CX(s) Applied: B1.3
Date: 01/29/2016
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision required to perform excavation, inspection and replacement of internal soft valve parts for 14 crude oil pipeline valves on WH 42-inch pipeline to Sunoco Terminal.