CX-014635: Categorical Exclusion Determination

Replace WHT-1 Flush Water and WHT-10 Seal Flush Tanks CX(s) Applied: B1.3Date: 01/11/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

January 11, 2016
Estimated Read Time   min

Replace WHT-1 Flush Water and WHT-10 Seal Flush Tanks
CX(s) Applied: B1.3
Date: 01/11/2016
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all labor, tools, equipment, materials, services, transportation, storage, and supervision required to replace the WHT-1 flush water and WHT-10 seal flush tanks. Tasks include demolition of existing tank foundations, construction of new tank foundations, demolition of existing WHT-1 and WHT-10 tanks, and installation of four new 750 bbl reinforced fiberglass tanks.