CX-013626: Categorical Exclusion Determination

Murray-Custer FY15 Wood Pole Replacement Project CX(s) Applied: B1.3Date: 05/01/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

May 1, 2015
Estimated Read Time   min

Murray-Custer FY15 Wood Pole Replacement Project
CX(s) Applied: B1.3
Date: 05/01/2015
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission lines.

Document(s) Available for Download