CX-013660: Categorical Exclusion Determination

Spring Creek-Wine Country #1 Dampener Project CX(s) Applied: B1.3Date: 03/18/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

March 18, 2015
Estimated Read Time   min

Spring Creek-Wine Country %231 Dampener Project
CX(s) Applied: B1.3
Date: 03/18/2015
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to install dampeners from structure 6/5 to 11/2 on the Spring Creek-Wine country #1 transmission line.

Document(s) Available for Download