Main Ring Service Buildings E2 and E3 Demolition CX(s) Applied: B1.16, B1.17, B1.23Date: 04/23/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Office of NEPA Policy and Compliance
April 23, 2015Main Ring Service Buildings E2 and E3 Demolition
CX(s) Applied: B1.16, B1.17, B1.23
Date: 04/23/2015
Location(s): Illinois
Offices(s): Fermi Site Office
The purpose of the proposed action/project is to remove the Main Ring Service Buildings E2 and E3. Due to the fact that the Main Ring is no longer operating, this would remove obsolete equipment and infrastructure; this is needed to eliminate the cost of maintaining, heating, cooling, and powering idle infrastructure.