CX-013767: Categorical Exclusion Determination

AFFF System Replacement at Bayou Choctaw, Big Hill and West Hackberry CX(s) Applied: B1.3Date: 04/07/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

April 7, 2015
Estimated Read Time   min

AFFF System Replacement at Bayou Choctaw, Big Hill and West Hackberry
CX(s) Applied: B1.3
Date: 04/07/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all engineering, design, labor, tools, equipment, materials, consumables, services, transportation, storage, and vendor shop drawings required to furnish, install and test a complete Aqueous Film Forming Foam (AFFF) proportioning system at the Bayou Choctaw, Bryan Mound and West Hackberry SPR sites.

Document(s) Available for Download