AFFF System Replacement at Bayou Choctaw, Big Hill and West Hackberry CX(s) Applied: B1.3Date: 04/07/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
April 7, 2015AFFF System Replacement at Bayou Choctaw, Big Hill and West Hackberry
CX(s) Applied: B1.3
Date: 04/07/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all engineering, design, labor, tools, equipment, materials, consumables, services, transportation, storage, and vendor shop drawings required to furnish, install and test a complete Aqueous Film Forming Foam (AFFF) proportioning system at the Bayou Choctaw, Bryan Mound and West Hackberry SPR sites.