CX-013796: Categorical Exclusion Determination

Chehalis District Access Road Maintenance CX(s) Applied: B4.6Date: 06/15/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

June 15, 2015
Estimated Read Time   min

Chehalis District Access Road Maintenance
CX(s) Applied: B4.6
Date: 06/15/2015
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to raise the height of an H-frame wood pole structure to remove a critical line impairment on the BPA Ellensburg-Moxee 115-kV transmission line between structures 5/6 and 5/7.

Document(s) Available for Download