Operation of ELE Permeameter CX(s) Applied: B3.6Date: 04/22/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 22, 2015Operation of ELE Permeameter
CX(s) Applied: B3.6
Date: 04/22/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The purpose of this task will be to test the permeability of various simulant samples from Saltstone Disposal Facility (SDF) using an existing permeameter located in laboratory B-110 of 773-A. Initial testing will be conducted on non-radioactive samples followed by testing on radioactive saltstone cores collected from the Saltstone Disposal Facility (SDF).