Clear Debris and Fallen Timber From Rows at the Sanitary Sludge Application Site CX(s) Applied: B1.3Date: 04/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 27, 2015Clear Debris and Fallen Timber From Rows at the Sanitary Sludge Application Site
CX(s) Applied: B1.3
Date: 04/27/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Clear fallen timber and regrowth from all 20 access rows that are ten feet wide and one thousand feet long and two additional access roads located on either end of the site that are of the same dimensions. The debris can be pushed to the sides or at the ends as long as the access roads to the rows are not blocked.