Repair Roof Drain Down Spout CX(s) Applied: B1.3Date: 02/03/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
February 3, 2015Repair Roof Drain Down Spout
CX(s) Applied: B1.3
Date: 02/03/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The scope of this work package will be to repair 4 roof drains on the 105-L building that show signs of deterioration. One area is inside L-Area Reactor building, the other 3 are outside, mounted to walls. This includes support activities such as scaffold erection/removal, paint removal, and disposal of old pipe sections.