Modify Jacket Drain Lines LD-1521 and LD-1545 to LD-LDB-1 at Tank 38 CX(s) Applied: B1.3Date: 02/12/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
February 12, 2015Modify Jacket Drain Lines LD-1521 and LD-1545 to LD-LDB-1 at Tank 38
CX(s) Applied: B1.3
Date: 02/12/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
A failed line segment pressure test occurred while testing the secondary containments associated with two lines.