CX-013492: Categorical Exclusion Determination

Subcontractor Will Provide Roof Repairs at K Reactor (918 Fan Room) CX(s) Applied: B1.3Date: 02/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

February 26, 2015
Estimated Read Time   min

Subcontractor Will Provide Roof Repairs at K Reactor (918 Fan Room)
CX(s) Applied: B1.3
Date: 02/26/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office

The subcontractor will provide roof repairs at K reactor (918 Fan Room).

Document(s) Available for Download