CX-013884: Categorical Exclusion Determination

BH Anhydrite Pond Chlorides Wash - Pilot Test and Full Pond Chlorides Wash CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

July 6, 2015
Estimated Read Time   min

BH Anhydrite Pond Chlorides Wash - Pilot Test and Full Pond Chlorides Wash
CX(s) Applied: B1.3
Date: 07/06/2015
Location(s): None Provided
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all equipment, materials, labor, transportation, supervision, and training required to install a de-watering well-point system within a portion of the existing BH Anhydrite Pond.