CX-013447: Categorical Exclusion Determination

Olympia-St. Clair Emergency Impairment Remedy CX(s) Applied: B4.6Date: 03/16/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

March 16, 2015
Estimated Read Time   min

Olympia-St. Clair Emergency Impairment Remedy
CX(s) Applied: B4.6
Date: 03/16/2015 
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to construct two new wood pole transmission structures. Two spans of the Olympia-St. Clair 23- kilovolt (kV) transmission line between structures 12/1 to 12/3 have been identified as having a significant impairment to the line. The new structures would be located at each location in the center of the current transmission line spans, to raise the conductor to a safe distance under current standards.

Document(s) Available for Download