Santiam-Toledo Structure 39/7 Replacement CX(s) Applied: B1.3Date: 41876 Location(s): OregonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
August 25, 2014Santiam-Toledo Structure 39/7 Replacement
CX(s) Applied: B1.3
Date: 41876
Location(s): Oregon
Offices(s): Bonneville Power Administration
Because of an identified NERC/WECC compliance issue, BPA proposes to rebuild the H-frame 230 kilovolt (kV) structure 39/7 on the Santiam-Toledo No. 1 line to provide National Electric Safety Code clearance to Consumer Power, Inc.'s 69-kV transmission line.
CX(s) Applied: B1.3
Date: 41876
Location(s): Oregon
Offices(s): Bonneville Power Administration
Because of an identified NERC/WECC compliance issue, BPA proposes to rebuild the H-frame 230 kilovolt (kV) structure 39/7 on the Santiam-Toledo No. 1 line to provide National Electric Safety Code clearance to Consumer Power, Inc.'s 69-kV transmission line.