LURR 20140504 Ross Substation Comcast Fiber Installation CX(s) Applied: B4.9Date: 41906 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 24, 2014LURR 20140504 Ross Substation Comcast Fiber Installation
CX(s) Applied: B4.9
Date: 41906
Location(s): Washington
Offices(s): Bonneville Power Administration
BPA proposes to approve land use review request 20140504, which would authorize Comcast to install conduit and a vault in BPA fee-owned right-of-way (ROW) between structures 176/3 and 176/2 on the McNary-Ross No 1 line.
CX(s) Applied: B4.9
Date: 41906
Location(s): Washington
Offices(s): Bonneville Power Administration
BPA proposes to approve land use review request 20140504, which would authorize Comcast to install conduit and a vault in BPA fee-owned right-of-way (ROW) between structures 176/3 and 176/2 on the McNary-Ross No 1 line.