Western Area Power Administration (Western) proposes to install a 48-count fiber optic ground wire on Western's existing Gering to Bridgeport and Bridgeport to Sidney 115 kilovolt Transmission Line between the Gering, Bridgeport, and Sidney Substations.
CX(s) Applied: B4.7
Date: 41857
Location(s): Nebraska
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (Western) proposes to install a 48-count fiber optic ground wire on Western's existing Gering to Bridgeport and Bridgeport to Sidney 115 kilovolt Transmission Line between the Gering, Bridgeport, and Sidney Substations.