Insulator Replacements for the Flagstaff to Pinnacle Peak #1 and #2 345 Kilovolt Transmission Lines CX(s) Applied: B1.3Date: 41821 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
July 1, 2014Insulator Replacements for the Flagstaff to Pinnacle Peak #1 and #2 345 Kilovolt Transmission Lines
CX(s) Applied: B1.3
Date: 41821
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (Western) proposes to conduct insulator replacements on the Flagstaff to Pinnacle Peak #1 and 2 transmission lines.
CX(s) Applied: B1.3
Date: 41821
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Western Area Power Administration (Western) proposes to conduct insulator replacements on the Flagstaff to Pinnacle Peak #1 and 2 transmission lines.