Direct Assessment and Repair of BH-SUN 36-inch Crude Oil Pipeline CX(s) Applied: B5.4Date: 41869 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
August 18, 2014Direct Assessment and Repair of BH-SUN 36-inch Crude Oil Pipeline
CX(s) Applied: B5.4
Date: 41869
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all supervision, transportation, labor, materials and equipment required to locate, excavate and inspect an internal corrosion anomaly at one location on the Big Hill to SUN Terminal 36-inch crude oil pipeline.
CX(s) Applied: B5.4
Date: 41869
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all supervision, transportation, labor, materials and equipment required to locate, excavate and inspect an internal corrosion anomaly at one location on the Big Hill to SUN Terminal 36-inch crude oil pipeline.