Hydrogen Sulfide Scavenger BOA (Multiple) CX(s) Applied: B5.2Date: 41880 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
August 29, 2014Hydrogen Sulfide Scavenger BOA (Multiple)
CX(s) Applied: B5.2
Date: 41880
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all materials, equipment, supplies, personnel, and transportation required to: (1) furnish hydrogen sulfide scavenger, (2) injection (pumping) equipment and operators for scavenger application, and (3) analytical/technical support at the BC and WH SPR sites for removal of hydrogen sulfide from crude oil delivered to commercial storage terminals.
CX(s) Applied: B5.2
Date: 41880
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all materials, equipment, supplies, personnel, and transportation required to: (1) furnish hydrogen sulfide scavenger, (2) injection (pumping) equipment and operators for scavenger application, and (3) analytical/technical support at the BC and WH SPR sites for removal of hydrogen sulfide from crude oil delivered to commercial storage terminals.