BHP-3 Offsite Bump Repair CX(s) Applied: B1.3Date: 41885 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
September 3, 2014"BHP-3 Offsite Bump Repair
CX(s) Applied: B1.3
Date: 41885
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, materials, equipment, supplies, tools, and transportation required to tear down, inspect, and perform any needed offsite repairs on the Big Hill pump, BHP-3.