CX-012662: Categorical Exclusion Determination

Montoe-Custer Miles 38 and 55-58 Access Road Improvements CX(s) Applied: B1.3Date: 41827 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

July 7, 2014
Estimated Read Time   min

Montoe-Custer Miles 38 and 55-58 Access Road Improvements
CX(s) Applied: B1.3
Date: 41827
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to conduct maintenance on selected sections of existing BPA easement access roads within the Monroe-Custer 500-kilovolt right-of-way (ROW).

Document(s) Available for Download