STM FTLB to Mesa Top Waterline Repair; NREL Tracking No. 15-015 Award Number: DE-AC36-08GO28308 CX(s) Applied: DOE/EA-1968 National Renewable Energy Laboratory (NREL) Date: 04/02/2015 Location(s): CO Office(s): Golden Field Office
Office of NEPA Policy and Compliance
April 2, 2015STM FTLB to Mesa Top Waterline Repair; NREL Tracking No. 15-015
Award Number: DE-AC36-08GO28308
CX(s) Applied: DOE/EA-1968
National Renewable Energy Laboratory (NREL)
Date: 04/02/2015
Location(s): Colorado
Office(s): Golden Field Office
The U.S. Department of Energy (DOE) proposes the emergency repair of a domestic water supply line between the Field Test Laboratory Building (FTLB) and the mesa top facilities at the National Renewable Energy Laboratory (NREL) South Table Mountain (STM) campus located in Golden, Colorado.