A document that DOE prepares in accordance with DOE NEPA regulations (10 CFR 1021.314(c)) to determine whether a supplemental or new EIS should be prepared pursuant to CEQ NEPA regulations (40 CFR 1502.9(c)).
Note: To view additional SAs issued by Bonneville Power Administration (BPA), please visit the following webpage: https://www.bpa.gov/efw/Analysis/NEPADocuments/Pages/default.aspx. For example, SAs issued for BPA’s Transmission System Vegetation Management Program EIS (DOE/EIS-0285) may be found under “Program Reviews,” then “Transmission System Vegetation Management Program….”
July 29, 2022
DOE/EA-2143-SA-01: Supplement Analysis
Supplement Analysis to evaluate design and engineering updates to the Freedom Pines Project.
April 14, 2022
EIS-0279-SA-07: Supplement Analysis
Savannah River Site Spent Nuclear Fuel Management
December 1, 2021
DOE/EIS-0285: Notice to Prepare a Supplement Analysis (December 2021)
New techniques for Transmission System Vegetation Management Program
September 16, 2021
DOE/EA-2116-SA-01: Supplement Analysis
Supplemental Analysis-01 (DOE/EA-2116) for transport/disposition of waste and excess materials from deactivation activities at Paducah Gaseous Diffusion Plant.
September 12, 2021
DOE/EIS-0247-SA-02: Supplement Analysis
Spallation Neutron Source Second Target Station; Oak Ridge National Laboratory, Oak Ridge, Tennessee
May 14, 2021
DOE/EA-1395-SA-01: Supplement Analysis
Supplement Analysis for DOE/EA-1395, Right-of-Way Maintenance in the Sacramento Valley, California.
May 5, 2021
DOE/EA-1697-SA-01: Supplement Analysis
WAPA prepared this Supplement Analysis for the San Joaquin Valley Right-of-Way Maintenance Project.
May 5, 2021
DOE/EA-1539-SA-01: Supplement Analysis
Supplement Analysis for DOE/EA-1539, North Area Right-of-Way Maintenance
May 3, 2021
DOE/EIS-0447-SA-01: Supplement Analysis for the Champlain Hudson Power Express Project
DOE prepared this SA to evaluate a proposed changes to the Champlain Hudson Power Express Project.
April 8, 2021
DOE/EIS-0026-SA-12: Supplement Analysis for the Waste Isolation Pilot Plant Site-wide Operations
DOE prepared this SA to evaluate a proposed change pertaining to the excavation of two underground replacement panels for the disposal of TRU waste.