Naval Reactors Facility (NRF) Production Support Complex 3rd Floor General Plant Project CX(s) Applied: B1.15Date: 04/27/2015 Location(s): OtherOffices(s): Naval Nuclear Propulsion Program
Construction and Operation of the Integrative Genomics Building at the Lawrence Berkeley National Laboratory LB-CX-15-03 CX(s) Applied: B1.15, B1.24, B1.33, B3.6, B3.12, B3.15Date: 04/21/2015Location(s): CaliforniaOffices(s): Berkeley Site Office
East Gate and Vasco Gate Kiosk Modifications CX(s) Applied: B1.15, B1.22, B1.32Date: 04/07/2015 Location(s): CaliforniaOffices(s): Lawrence Livermore Site Office
Construction and Operation of the Photon Science Laboratory Building CX(s) Applied: B1.15, B3.6Date: 04/07/2015 Location(s): CaliforniaOffices(s): Stanford Linear Accelerator Site Office
St. Petersburg College Green Living Demonstration Center Award Number: DE-EE0001207 CX(s) Applied: A9, B1.15, B5.1, B5.15 Building Technologies Office Date: 04/06/2015 Location(s): FL Office(s): Golden Field Office
Fermi National Accelerator Laboratory- Industrial Complex Buildings Addition CX(s) Applied: B1.15Date: 04/02/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Installation of New A-Area Fire Water Pumphouse CX(s) Applied: B1.15Date: 04/02/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Building 12-75B Expansion for UPS and Heating, Ventilation and Air Conditioning Upgrade CX(s) Applied: B1.15, B2.1Date: 03/17/2015 Location(s): TexasOffices(s): Pantex Site Office
285-H Instrument Air Compressor System Shed CX(s) Applied: B1.15Date: 02/26/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Administrative Support Complex CX(s) Applied: B1.15Date: 02/26/2015 Location(s): TexasOffices(s): Pantex Site Office