EA-1894: Albeni Falls Flexible Winter Lake Operations, Bonner, Idaho

DOE’s Bonneville Power Administration and the U.S. Army Corps of Engineers, as co-lead Federal agencies, prepared this EA to evaluate the potential environmental impacts of a proposal to operate Albeni Falls dam during the winter months (approximately December 15th to March 31st) and determine whether the existing Columbia River System Operation Review EIS (DOE/EIS-0170) is adequate or a supplemental or new EIS is required.