The subcontractor shall provide all labor, materials, tools, equipment, transportation, and supervision to install new insulation around the center copper line on the air conditioning duct in building 318 that was left exposed and causing the pipe to sweat. This is to also include installing 100 feet of condensation pans attached to the unistrut to help eliminate further problems.