Rebuild a 69-kV transmission line, convert 30 segments of distribution lines from overhead to underground, and install OPGW communications infrastr…
This project plans to replace an aging 60kV transmission line with a new 115kV line approximately 7.9 miles in length. In addition to this line, op…
Construct 20'x60' structure in which Substation/Switchgearwill be installed. Excavate trenches for conduit installation between Power Plants and S…
Replacement of existing reclosers with new vacuum reclosers, Addition of auto-source transfer equipment on our existing distribution lines to impro…
Installation of new transmission poles and overhead line equipment in existing right-of-way and removing of existing poles and accessories. Replace…
The DOE Loan Programs Office (LPO) is considering whether to issue a loan guarantee of a funding facility to the Alabama Power Company (APC) pursuant to its authority under the EIR 1706 Program.
Completion of full engineering design of a SCADA system for our electric distribution system and installation of SCADA electronic equipment at two …
Replacing electric poles to ensure more reliable service. Implementing monitoring systems at the Anson Substation. Strengthening infrastructure at …
To improve reliability and facilitate maintenance access, BPA proposes to expand and make related communication and equipment service upgrades at t…
Bonneville Power Administration (BPA) proposes to install electronic equipment and fiber optic cable at Boardman and Morrow Flat substations, rebui…