CX-270217: United States Geological Survey (USGS) Geotechnical Drilling for USGS-142 and USGS-143 Rev. 1

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

July 31, 2016
Estimated Read Time   min

Concrete was used during construction of geotechnical borehole United States Geological Survey (USGS)-142, and cement overflowed into the section of the borehole where water levels were needed to be measured. The purpose of this revision is to drill an additional borehole, USGS-142A, approximately 10 to 25 feet from USGS-142 in order to measure water levels.