Demolition and safe removal of existing 69kV underground cable. Installation of new transmission cable, termination, and splicing. Construction of …
Office of NEPA Policy and Compliance
April 14, 2026Demolition and safe removal of existing 69kV underground cable. Installation of new transmission cable, termination, and splicing. Construction of the dedicated hospital power feed and switching facilities. System testing, validation, and phased energization. Final integration and grid interconnection. System Commissioning