CX-035486: Chief Joseph-Snohomish No. 3 Access Road Project (update to previous CX determination issued 6/13/2025)

Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 …

Office of NEPA Policy and Compliance

March 30, 2026
Estimated Read Time   min

Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 and 35 on the Chief Joseph-Snohomish No. 3 transmission line.