The primary objective of this project is to demonstrate the performance, resilience, and cost-effectiveness of a 100kW/1.2MWh Bio-Mineralized Lithi…
Office of NEPA Policy and Compliance
August 7, 2025The primary objective of this project is to demonstrate the performance, resilience, and cost-effectiveness of a 100kW/1.2MWh Bio-Mineralized Lithium Mixed-Metal Phosphate grid-scale energy storage system (ESS) at a critical energy storage facility.