BPA proposes to reconductor and replace associated hardware along the Wautoma-Rock Creek No. 1 500 kV transmission line from miles 37 to 43. Replac…
Office of NEPA Policy and Compliance
June 10, 2025BPA proposes to reconductor and replace associated hardware along the Wautoma-Rock Creek No. 1 500 kV transmission line from miles 37 to 43. Replacement is needed because the conductor was damaged by high winds twisting the phases together.