CX-034019: Chief Joseph-Snohomish No. 3 Access Road Project

Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 …

Office of NEPA Policy and Compliance

June 13, 2025
minute read time

Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 and 35 on the Chief Joseph-Snohomish No. 3 transmission line.