The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. T…
Office of NEPA Policy and Compliance
March 13, 2025The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. These lines have become brittle and more susceptible to breaking. All other areas in the City have been upgraded to aluminum wire and this project would complete this upgrade for our system.